Residential Apartment

PROJECT LIST
500 West 22nd St #5AB
Led full MEP design for a seamless apartment combination, including mechanical, electrical, and plumbing (MEP) systems. Delivered board-ready documentation, including load calculations and service coordination, resulting in swift condo board approval.
473 West End Ave #15A
Provided turnkey MEP engineering services for a high-end renovation, ensuring comfort, efficiency, and compliance. Managed all condo board submissions to streamline approvals and keep the project moving forward.
285 Riverside Dr #3D
Reviewed the apartment’s electrical service and delivered code-compliant load calculations and letters to the co-op board. Helped the design team avoid costly delays with a fast-track approval process.
220 Riverside Blvd #32B
Performed a detailed electrical service review and provided tailored load calculations and NEC-compliant documentation. Successfully navigated co-op board requirements to support the client’s renovation timeline.
176 East 71st St #10C
Assessed existing electrical capacity and submitted clear, board-ready documentation to support apartment upgrades. Our early involvement ensured fast approvals and minimized redesign risk.
140 West End Ave #27AB
Supported a unit combination with an electrical service review and custom load calculation package. Streamlined the co-op board approval process to keep construction on schedule.
120 East 87th St #PH22
Provided full MEP design for a luxury penthouse renovation, integrating high-performance systems with architectural intent. Delivered all condo board documentation for a smooth approval experience.
70 East 10th St #9V
Reviewed the unit’s electrical service and submitted strategic load calculations to meet co-op board standards. Helped the client move forward without service upgrades or delays.
44 West 62nd St #11E
Prepared and submitted NEC-compliant electrical load calculations to support an interior renovation. Our documentation and board coordination helped clear the path to construction quickly.
44 West 62nd St #4EF
Delivered electrical service analysis and board-ready documentation tailored to the apartment’s upgrade needs. Ensured a smooth co-op approval with minimal back-and-forth.
44 West 62nd St #3AB
Provided targeted electrical engineering support, including load calculations and compliance letters, to satisfy co-op requirements and support unit upgrades.
32 Morton St #5B
Full MEP design for a West Village apartment renovation, balancing performance and aesthetics. Managed all condo board submissions to ensure zero delays to construction start.
30 Lincoln Plaza #14GH
Reviewed and optimized the unit’s electrical service, submitting tailored documentation to satisfy co-op board requirements. Supported a fast and frictionless approval process.
9 East 96th St #16B
Delivered complete MEP design for a high-end apartment renovation, coordinating directly with the design team and condo board. Our strategic documentation helped keep the project on track.
5 Riverside Dr #2A
Provided full-service MEP design for a Riverside Drive residence, combining engineering precision with client goals. Handled all board submissions to simplify approvals and accelerate progress.